Call us on 0845 459 90 57

  • Replacement of Low Voltage Switchboard

    December 13 2010

    This project consisted of the replacement of the main low voltage switchgear within the ground floor switch room of the Leeds University Electrical Engineering Building. The project was complicated by the fact many of the existing large power circuits were old MICC cables and not identified. ... Read more

  • Mechanical & Electrical Services

    December 13 2010

    Large Contact Centres filled with people, in this case over 1500, operating 16 hours a day 7 days a week are a challenge for any organisation to keep the buildings functioning effectively. ... Read more

  • Office Fit Out - New 700 Seat "State of the Art" Contact Centre

    One of the UK's largest outsourced Contact Centres with over 11,000 employees operating out of 7 UK centres and one 1500 seat facility in Pune - India totalling over 750,000 sq feet, Ventura exclusively use Cube Support Services for the design, management and operation of all their facilities across the UK.... Read more

  • Fit Out of Presentation Facility

    Following a number of submissions from interior design and fit out organisations suggesting project costs in the region of £250,000, VND called in Cube to come up with our proposals for the design and installation of a new Presentation Suite.... Read more

  • Fit Out of New 400 Seat Contact Centre for Lowell Financial Ltd

    Cube Support Services Ltd have recently completed the design and installation of a new 400 seat contact centre for Leeds based Lowell Financial Ltd.... Read more

  • 1250KVA Standby Diesel Generator Installation

    Emergency standby power plant is an essential piece of equipment for any organisation investing in its installation. The project for Cube was to upgrade the clients existing standby diesel generator set with a new 1250 Kva P1 rated set. ... Read more

  • Data Centre Facility Design & Installation

    Expansion of the clients business created the requirement for a new and expanded data centre facility. A complex project requiring precise and detailed project management and co-ordination, Cube Electrical undertook the design and installation of new data racks, under floor flood cabling network, telephony frame, new up graded UPS system as well as employed managed third party contracts for building works, fire systems and client service providers.... Read more

  • Space Maximisation for Lowell Financial

    Due to rapid expansion, Lowell asked Cube to investigate and ideas to maximise the use of space in their existing building. The facility, some 20,000 sq ft in area, had 240 contact centre seats, along with the usual facilities of data centre, training rooms, meeting rooms, private offices.... Read more

  • Building Repair & Maintenance for Lowell Group

    With two facilities in Leeds and one in Preston, Cube ‘s relationship began with Lowell in 2006 and from what was a small beginning , the relationship has developed to an extent where Lowell have appointed Cube to look after a wide range of technical and non technical facilities services.... Read more

  • Office Fit-out and Refurbishment VWG

    Cube were appointed to undertake the design and refurbishment of the Volkswagen Group National Contact Centre based in Leeds. VWG wished to provide a more open feel to the environment for their employees in the 25,000 square foot facility and create individually identifiable space for each of the five separate brands within the Group. ... Read more

  • Office Re-Design for Hitachi Capital

    A successful business, growing and in need of an organisation to provide a creative solution to a problem of insufficient space for new team members and lacking in meeting, training and conference facilities, Cube were recommended to Wendy Capelin HR, Facilities and Training Manager by their neighbouring organisation who used us for similar services.... Read more